Category

News

An electrical service provider designs a revolutionary aluminum structure

By | News | No Comments

In the spring of 2006, Technologies Dual-ADE revealed its brand new structure design for the construction of modules for electromechanical systems. Designed by Mr. Yves Thibault, Director of Innovation and Technology, the Modu-AL was immediately recognized as a significant innovation by several industry stakeholders.

 

Link to original article

Revue Industrie & Commerce, janvier/février 2007  M. Éric Ducharme Président Technologies Dual-ADE M. Yves Thibault Directeur Innovation et Technologies

Revue Industrie & Commerce, January/February 2007

Mr. Éric Ducharme
President Technologies Dual-ADE
Mr. Yves Thibault
Director of Innovation and Technology

Technologies Dual-ADE Inc. is a well-performing company which Alouette has been a part of

By | News | No Comments

Aluminum is a very significant leverage in our development and success, which differentiates us from our competition today. We have surprised and impressed our clients with this alloy, Aluminum, which we have included in our equipment. After two years of Research and Development, we have replaced the steel structures of our switchgear cabinets with Aluminum structural members – extrusions. Thank you to ALOUETTE and particularly to Mr. Donald Galienne for having supported us in our development. As a result, together we have succeeded in creating an innovation which was daring at the start and yet – as seen by its success – seems obvious today.

You will be hearing more about Dual-ADE in the future since we have other ideas which will involve Aluminum and are proud of our association with Alouette.

 

Le mercredi 21 mars 2007 Club Nautique de Sept-Iles  Le Président d’Alouette (à gauche) et le Maire de Sept-Iles (à droite)Wednesday, March 21, 2007
Club Nautique de Sept-Iles

President of Alouette (on the left)
and the Mayor of Sept-Îles (on the right)

Contract in Haiti with Hydro-Québec International

By | News | No Comments

Dual-ADE obtained a first contract in Haiti with Hydro-Québec International and a second contract in collaboration with UNOPS

Last May, we obtained a contract with Hydro-Québec International in Haiti. The first part of the contract would consist of tests at the Sault-Mathurine power plant in the Les Cayes region (transformers, circuit-breakers etc.) over a period of approximately 7 full days.

We have obtained a second contract in collaboration with UNOPS for a retrofitting project at the Onde Verte power plant.